Biuro Koordynacji Projektu Ochrony Przeciwpowodziowej Dorzecza Odry i Wisły

DOCUMENTS

Project Operations Manual

Environmental and Social Management

Resettlement Policy Framework

Procurement Plans

Currently:

Archive:

Expertises and studies

PCU Financial Statements (available only in Polish)

for year 2018:

Environmental Management Plans

Environmental Management Plans

  • Appendix 5. Location map of the Task:
  • Appendix 6. Location map of the Task on the background of designated areas:
  • Appendix 7. Potential flood danger area:
  • Appendix 8. Terrains excluded from the areas with a potential flood risk:

EMP for Contract 1B.1/1 (a): Reconstruction of the Odra River control infrastructure - adjusting to the III class of waterway, on the section from the village of Ścinawa to the estuary of the Nysa Łużycka River – Stage II

  • Appendix 5 - Maps presenting the locations of Task:
  • Appendix 6 - Situation plans of groynes:
  • Appendix 8 -Reports on the public disclosure procedure:

EMP for Contract 1B.6: Flood protection of Nowa Sól and Below Krosno Odrzańskie - Task 1B.6/1: Nowa Sól

EMP for Contract 1B.6: Flood protection of Nowa Sól and Below Krosno Odrzańskie - Task 1B.6/2: Wężyska – Chlebowo

EMP for Contract 1B.7: WFS Widawa – the rebuilding of the flood management system of the communes and municipalities Czernica, Długołeka, Wisznia Mała and Wrocław

  • Appendix 6 - Maps:

EMP for Contract 1C.1: Extension and construction of flood embankments and Reconstruction of Czarny Kanal and Racza Struga (Słubice)

EMP for Contract 2A.1/1: Construction of “Boboszów” – a dry flood control reservoir on Nysa Kłodzka River - EMP updated environmental decision

Draft Annex to the Environmental management plan PLAN

Annex to the Environmental management plan PLAN

EMP for Contract 2A.1/2: Construction of "Roztoki Bystrzyckie" – a dry flood control reservoir on Goworówka stream

  • Decision of RDOŚ 18.12.2015
  • Correcting of RDOŚ 1.03.2016
  • Decision of Burmistrz Miasta i Gminy Międzylesie 15.01.2016
  • Decision of RDOŚ 13.01.2016

EMP for Contract 2A.2/1: Construction of "Szalejów Górny" – a dry flood control reservoir on Bystrzyca Dusznicka River

EMP for Contract 2A.2/2: Construction of “Krosnowice” – a dry flood control reservoir on Duna stream

EMP for Contract 3A.3 Section 4 - Right embankment of the Vistula from the Skawinka estuary to the Kościuszko barrage

EMP for Contract 3B.1: Flood protection Sandomierz

  • Appendix 6 - Location map of the Task on the background of designated areas
  • Appendix 7 - Potential flood danger area sheet 1
  • Appendix 8 - Terrains excluded from the areas with a potential flood risk

MP for Contract 3B.2: Flood protection Tarnobrzeg

EMP for Contract 3B.3: Flood protection Tarnobrzeg - stage 1 (Wisła 1)

EMP for Contract 3B.3: Flood protection Tarnobrzeg - stage 1 (Wisła 1)

EMP for Contract 3D.1: San Programme. Passive Protection in San Basin

Drafts of Environmental Management Plan

Projekt PZŚ dla kontraktu 1B.3/1 Etap I: Budowa bazy postojowo-cumowniczej dla lodołamaczy

Draft of EMP for Contract 3D.2/1: Construction of the right embankment of the Biala River in the City of Tarnów

RAP - Land Acquisition and Resettlement Action Plans

RAP for Contract 1A.1: Chlewice-Porzecze. Backwater embankment of Odra River at Myśla River and Modernization of Marwicki polder stage I and II

  • Location maps of the Task:

RAP for Contract 1B.6: Flood protection of Nowa Sól and below Krosno Odrzańskie

RAP for Contract 1B.7: WFS Widawa – the rebuilding of the flood management system of the communes and municipalities Czernica, Długołeka, Wisznia Mała and Wrocław

RAP for Contract 1C.1: Extension and construction of flood embankments and Reconstruction of Czarny Kanał and Racza Struga

RAP for Contract 2A.1/1: Construction of "Boboszów" – a dry flood control reservoir on Nysa Kłodzka River

RAP for Contract 2A.1/2: Construction of a dry flood control reservoir on the Goworówka stream in Roztoki

RAP for Contract 2A.2/1: Construction of "Szalejów Górny" - a dry flood control reservoir on Bystrzyca Dusznicka River

RAP for Contract 2A.2/2: construction of "Krosnowice" - a dry flood control reservoir on Duna stream

RAP for Contract 3A.3: Section 4 - The right embankment of the Vistula River from the estuary of Skawinka to the Kościuszko barrage

RAP for Contract 3B.1: Flood protection Sandomierz

AP for Contract 3B.2: Flood Protection Tarnobrzeg

>> Section I: fig.2.1, fig.2.2, fig.2.3, fig.2.4, fig.2.5, fig.2.6, fig.2.7, fig.2.8 >> Section II: fig.2.1, fig.2.2, fig.2.3 >> Section III: fig.2.1, fig.2.2, fig.2.3 >> Section SAN: fig.2.1, fig.2.2, fig.2.3 >> LDP – dictionary: fig.2.1,

RAP for Contract 3B.3: Flood Protection of Tarnobrzeg – Stage 1 (Vistula River 1)

RAP for Contract 3D.1: San Progamme. Passive Protection in San basin. „San III – extension of the left embankment of the San River at km 0+000 – 4+445, Gorzyce Commune, Podkarpackie Province”

Final reports of Environmental Management Plan

Raport końcowy z realizacji Planu Zarządzania Środowiskiem dla kontraktu 3B.3: Ochrona przeciwpowodziowa Tarnobrzegu – etap 1 (Wisła 1)

  • Contract 3B.3: Flood protection Tarnobrzeg – Stage 1 (Wisła 1) Target: “Vistula River – Stage 1 – extension of the right bank of Vistula River at km 5+950 – 15+819 on the stretch from Tarnobrzeg (Skalna Góra) to Kocmierzowa (border of Podkarpackie and Swietokrzyskie Provinces)”
Skip to content