Biuro Koordynacji Projektu Ochrony Przeciwpowodziowej Dorzecza Odry i Wisły

DOCUMENTS

Project Operations Manual

Environmental and Social Management

Resettlement Policy Framework

Procurement Plans

Currently:

Archive:

Expertises and studies

PCU Financial Statements (available only in Polish)

for year 2018:

Environmental Management Plans

Environmental Management Plans

  • Appendix 5. Location map of the Task:
  • Appendix 6. Location map of the Task on the background of designated areas:
  • Appendix 7. Potential flood danger area:
  • Appendix 8. Terrains excluded from the areas with a potential flood risk:

EMP for Contract 1B.1/1 (a): Reconstruction of the Odra River control infrastructure - adjusting to the III class of waterway, on the section from the village of Ścinawa to the estuary of the Nysa Łużycka River – Stage II

  • Appendix 5 - Maps presenting the locations of Task:
  • Appendix 6 - Situation plans of groynes:
  • Appendix 8 -Reports on the public disclosure procedure:

EMP for Contract for works 1B.3/1 Stage 1: Mooring base for icebreakers

EMP for Contract 1B.6: Flood protection of Nowa Sól and Below Krosno Odrzańskie - Task 1B.6/1: Nowa Sól

EMP for Contract 1B.6: Flood protection of Nowa Sól and Below Krosno Odrzańskie - Task 1B.6/2: Wężyska – Chlebowo

EMP for Contract 1B.7: WFS Widawa – the rebuilding of the flood management system of the communes and municipalities Czernica, Długołeka, Wisznia Mała and Wrocław

  • Appendix 6 - Maps:

EMP for Contract 1C.1: Extension and construction of flood embankments and Reconstruction of Czarny Kanal and Racza Struga (Słubice)

EMP for Contract 2A.1/1: Construction of “Boboszów” – a dry flood control reservoir on Nysa Kłodzka River - EMP updated environmental decision

Draft Annex to the Environmental management plan PLAN

Annex to the Environmental management plan PLAN

EMP for Contract 2A.1/2: Construction of "Roztoki Bystrzyckie" – a dry flood control reservoir on Goworówka stream

  • Decision of RDOŚ 18.12.2015
  • Correcting of RDOŚ 1.03.2016
  • Decision of Burmistrz Miasta i Gminy Międzylesie 15.01.2016
  • Decision of RDOŚ 13.01.2016

EMP for Contract 2A.2/1: Construction of "Szalejów Górny" – a dry flood control reservoir on Bystrzyca Dusznicka River

EMP for Contract 2A.2/2: Construction of “Krosnowice” – a dry flood control reservoir on Duna stream

EMP for Contract 3A.3 Section 4 - Right embankment of the Vistula from the Skawinka estuary to the Kościuszko barrage

EMP for Contract 3B.1: Flood protection Sandomierz

  • Appendix 6 - Location map of the Task on the background of designated areas
  • Appendix 7 - Potential flood danger area sheet 1
  • Appendix 8 - Terrains excluded from the areas with a potential flood risk

MP for Contract 3B.2: Flood protection Tarnobrzeg

EMP for Contract 3B.3: Flood protection Tarnobrzeg - stage 1 (Wisła 1)

EMP for Contract 3B.3: Flood protection Tarnobrzeg - stage 1 (Wisła 1)

EMP for Contract 3D.1: San Programme. Passive Protection in San Basin

EMP for Contract 3D.2/1: Construction of the right embankment of the Biala River in the City of Tarnów

EMP for Contract 3D.2/2: Expansion of the left and right embankment of the Biala River in the Tarnow Municipality and the City of Tarnow

Drafts of Environmental Management Plan

Draft of EMP for Contract 1B.3/1 Stage I: Construction of a berthing and mooring base for icebreakers

Draft of EMP for Contract 1B.4/2 Dredging of Klucz-Ustowo ditch

Draft of EMP for Contract 3D.2/1: Construction of the right embankment of the Biala River in the City of Tarnów

Draft of EMP for Contract 3D.2/2: Expansion of the left and right embankment of the Biala River in the Tarnow Municipality and the City of Tarnow

RAP - Land Acquisition and Resettlement Action Plans

RAP for Contract 1A.1: Chlewice-Porzecze. Backwater embankment of Odra River at Myśla River and Modernization of Marwicki polder stage I and II

  • Location maps of the Task:

RAP for Contract 1B.6: Flood protection of Nowa Sól and below Krosno Odrzańskie

RAP for Contract 1B.7: WFS Widawa – the rebuilding of the flood management system of the communes and municipalities Czernica, Długołeka, Wisznia Mała and Wrocław

RAP for Contract 1C.1: Extension and construction of flood embankments and Reconstruction of Czarny Kanał and Racza Struga

RAP for Contract 2A.1/1: Construction of "Boboszów" – a dry flood control reservoir on Nysa Kłodzka River

RAP for Contract 2A.1/2: Construction of a dry flood control reservoir on the Goworówka stream in Roztoki

RAP for Contract 2A.2/1: Construction of "Szalejów Górny" - a dry flood control reservoir on Bystrzyca Dusznicka River

RAP for Contract 2A.2/2: construction of "Krosnowice" - a dry flood control reservoir on Duna stream

RAP for Contract 3A.3: Section 4 - The right embankment of the Vistula River from the estuary of Skawinka to the Kościuszko barrage

RAP for Contract 3B.1: Flood protection Sandomierz

RAP for Contract 3B.2: Flood Protection Tarnobrzeg

>> Section I: fig.2.1, fig.2.2, fig.2.3, fig.2.4, fig.2.5, fig.2.6, fig.2.7, fig.2.8 >> Section II: fig.2.1, fig.2.2, fig.2.3 >> Section III: fig.2.1, fig.2.2, fig.2.3 >> Section SAN: fig.2.1, fig.2.2, fig.2.3 >> LDP – dictionary: fig.2.1,

RAP for Contract 3B.3: Flood Protection of Tarnobrzeg – Stage 1 (Vistula River 1)

RAP for Contract 3D.1: San Progamme. Passive Protection in San basin. „San III – extension of the left embankment of the San River at km 0+000 – 4+445, Gorzyce Commune, Podkarpackie Province”

Drafts of RAP - Land Acquisition and Resettlement Action Plan

Draft of RAP for Contract 1B.3/1 Construction of mooring base for icebreakers

  • Draft of RAP for Contract 1B.3/1 Construction of mooring base for icebreakers

Draft of RAP for Contract 1B.3/2 Construction of berth mooring infrastructure of the Lower and Border Odra and new marking of the shipping route

  • Draft of RAP for Contract 1B.3/2 Construction of berth mooring infrastructure of the Lower and Border Odra and new marking of the shipping route

Draft of RAP for Contract 3D.2/1: Construction of the right embankment of the Biala River in the City of Tarnów

Final reports of Environmental Management Plan

Raport końcowy z realizacji Planu Zarządzania Środowiskiem dla kontraktu 3B.3: Ochrona przeciwpowodziowa Tarnobrzegu – etap 1 (Wisła 1)

  • Contract 3B.3: Flood protection Tarnobrzeg – Stage 1 (Wisła 1) Target: “Vistula River – Stage 1 – extension of the right bank of Vistula River at km 5+950 – 15+819 on the stretch from Tarnobrzeg (Skalna Góra) to Kocmierzowa (border of Podkarpackie and Swietokrzyskie Provinces)”
Skip to content